Introduction
Tube Tech was contracted by a liquified natural gas (LNG) plant in Nigeria.
The plant required IRIS and Eddy current inspection work on various heat exchangers.
Tube Tech was able to mobilise a team in less than two weeks, and due to coronavirus restrictions, this was a monumental challenge! To get LOIs, visa application and approval, COVID-19 testing and freight all in this short period was just short of a miracle.
The client was very pleased with the swift managerial action and proactive response during these challenging times.
And was yet again impressed with the high quality of service and work carried out.