Solidified Fat Blockage Removed

Collapsed Liner Removed Quickly and Easily

An Essex based food production Company realised that standard high pressure water jetting was not an option when a production pipeline became blocked with solidified fat. Tube Tech were able to clean the pipe, which was in excess of 200-m, back to production standard using a variety of advanced cleaning techniques.

  • 200m long, 4" pipeline with slight bend and 4x access points.
  • Pipeline was blocked with hard congealed fat.
  • Previous standard high pressure water jetting had failed to remove the deposit.
  • Pigging had also failed and a pig was stuck in a section of the pipeline.

Tube Tech were able to mobilise urgently, unblock the pipeline and remove the deposit by using:

  • Bespoke unblocking heads.
  • Cleaning and polishing heads with 360° surface contact.
  • SafeFlex system.
  • Wysper pump unit.
  • Extendable SafeJet lance system.

Tube Tech technicians were also able to retrieve lodged pig in the final 30m of the pipeline.

Scott Donson, Technical Sales Manager: “This product was so congealed we needed to use our most advanced cleaning techniques to remove it but as usual Tube Tech arrived on site prepared for all eventualities. Our client was pleased with the safe and quick cleaning service we provided.”

Related Case Studies

Lorem ipsum dolor sit amet, consectetur adipiscing elit. Praesent sit amet nisl nec elit dictum tincidunt quis vitae nunc. Duis aliquam malesuada erat, quis consectetur justo varius vitae. Praesent faucibus est quis ipsum vestibulum finibus. Maecenas et ex id nibh imperdiet imperdiet. Morbi bibendum vel erat sit amet elementum.

Mud Pump Pipe Cleaning at Tube Tech HQ

Read More

Rock Like Blockage Removed

Read More

Self-Propelled drilling units mobilised to Europe

Read More

Subsea Pipeline Unblocked On-Line

Read More

Tall Oil Heater Tube Nest – Oil Deposit Removed

Read More

Pipeline Cleared of Toxic Nicotine Deposit

Read More

Free Quote - 24 Hour Response

Send us your enquiry below and a Tube Tech International specialist will respond within 24 hours. Regardless of your industry sector or severity of fouling, we will have a solution to deliver guaranteed results.