- Tube Tech met all the client's health and safety requirements before mobilising.
- The studs were longer than indicated by the clients drawings. However, the "Remote Controlled Furnace Robot" was quickly re-calibrated to suit the new dimensions.
- The deposits consistency was closer to cement than mud but the robot was adapted to clear deposits from between the studded rows within the convection cell.