MODIFICATIONS help pharmaceutical manufacturer clean hard-to-reach equipment.

Being unable to reach into equipment meant staff at a global biopharmaceutical manufacturing site were faced with a risk of cross-contamination during product switch over. The team at Tube Tech International were asked to find a way to clean the equipment as part of ongoing work with the company.

The site, in the heart of England, faced a risk of cross-contamination when changing products. Traditional cleaning methods were not possible as staff could not reach into the twin-skin cone, and for this company there is no compromise with cleanliness.

As part of larger ongoing works, Tube Tech modified lances and produced a holding flange to allow the lance and head to be held safely while being manipulated to deep clean the problem area.

The new modifications prevented any spoiling of product and the associated costs, allowing the pharmaceutical level cleaning required. Site Engineer, said: “Thank you for your help arranging all this at such short notice. It is very much appreciated. "I would like to take this opportunity to thank the team in attendance too. Please pass on my appreciation of their professional, conscientious approach. Which together with their determined attitude and ingenuity ensuring a successful result.”

Related Case Studies

Read our latest case studies to find out how we use our unique cleaning solutions and specialist knowledge to tackle some of the world’s toughest fouling challenges.

Drain Contract – Collapsed Drain Liner Removal

Read More

Drain Contract – Collapsed Plastic Pipe Liner Removed From Domestic Sewer Pipe

Read More

Drain Contract – Concrete Removed From Drainage System Beneath Luxury Residence

Read More

Drain Contract – High-tensile Steel Pipe Removed from Clay Drain

Read More

Robotic Re-bars Removal Avoids Excavating Clay Drain

Read More

25 metres of solid concrete drilled out of deep drain

Read More

Free Quote - 24 Hour Response

Send us your enquiry below and a Tube Tech International specialist will respond within 24 hours. Regardless of your industry sector or severity of fouling, we will have a solution to deliver guaranteed results.